When demolition is needed
Demolition or strip-out is needed when materials are too damaged or contaminated to clean, or when a renovation needs a clean start. It is often part of a larger decontamination, flood recovery or fire recovery job.
- Plasterboard, ceilings or cabinetry that can't be cleaned after meth, mould or flood damage
- Internal strip-outs before renovation
- Removal of sheds, garages and outbuildings
- Fire or storm damaged structures
Our demolition process
Site assessment and planning
We check for hazards such as asbestos and lead paint and plan the safest method.
Utility disconnections
Power, gas and water are isolated by the relevant trades before work starts.
Demolition
Work is carried out in a controlled sequence to protect the parts of the property that stay.
Waste management and clean up
Waste is separated, removed and recycled where possible, and the site is left clean.
Hazardous materials such as asbestos must be identified and removed before general demolition starts.
Strip-out after contamination
When meth, mould, flood or fire damage goes too deep to clean, materials like plasterboard, ceilings, cabinetry and flooring must be removed. We strip out only what testing and inspection show is necessary, contain dust and debris, and leave the structure clean and ready for rebuilding.
- Targeted removal that protects what can be kept.
- Separation of contaminated and general waste.
- Documentation of what was removed and why.
Planning a rebuild? Our end to end management service coordinates the trades.
Safety and compliance
- Hazardous materials are identified before work starts.
- Services such as power, gas and water are isolated by licensed trades.
- Dust and debris are controlled to protect neighbours.
- Waste is separated and disposed of appropriately, with records kept.
Why hazards must be handled before demolition
Demolishing or stripping out a building without first identifying asbestos, lead paint and other contaminants spreads those hazards across the site and into neighbouring properties.
- Workers and neighbours can be exposed to asbestos fibres and lead dust.
- Contaminated waste mixed with general waste becomes far more expensive to dispose of.
- Regulators can stop work and issue penalties.
Frequently asked questions
Do I need council approval for demolition?
Many demolition jobs need approval from your local council, especially full structures. Internal strip-outs usually don't. Check with your council or ask us to help you find out.
Can you rebuild after demolition?
We can coordinate reinstatement through our end to end property management service.
Do you remove asbestos before demolition?
Asbestos must be identified and removed by appropriately licensed removalists before general demolition. See asbestos removal.
Can you demolish just part of a building?
Yes. Partial strip-outs and internal demolition are a large part of our work.
Is demolition waste recycled?
Clean materials are separated for recycling where possible. Contaminated waste is disposed of appropriately.



